How to float out and install a 19,600-ton offshore platform?
Mammoet has achieved a significant milestone by loading out and installing a massive 19,600-ton offshore platform. This accomplishment is a part of the Azeri Central…
Mammoet has achieved a significant milestone by loading out and installing a massive 19,600-ton offshore platform. This accomplishment is a part of the Azeri Central…
Boskalis has been awarded two contracts for the transportation and installation of the export and array cables for the Baltica 2 offshore wind farm. The…
PRESS RELEASE – Spliethoff has recently signed a contract with Mawei Shipyard for the newbuild of two DP2- B-type vessels. The versatile characteristics of Spliethoff’s…
Heerema’s “Swiss pocket knife” Aegir has successfully installed the 2,500 tonnes weighing cutter ladder into DEME’s new cutter suction dredger Spartacus, the largest and most…